Case Study - Effluent Tank Control System

Picture
This contract was placed with us through NSG Environmental for a nuclear waste repository site.

The scope was to provide the following: -
  • Review, revise both electrical and mechanical drawings and prepare panel layout drawings
  • Supply and manufacture effluent tank control panel as per issued drawings to CQR 03
  • Commissioning test documentation
  • Detailed design of tank level indication panel
  • Supply and manufacture tank level indication panel to CQR 03
  • To supply field instrumentation from endress & hauser as per issued the end clients equipment datasheets
  • Supply equipment for functional test
  • Factory Acceptance Testing (FAT) with NSG environmental and then end client in attendance at our facility.
  • Provide supporting documentation including Quality Plan, Certificates of Conformity for components, LTQR File and CE Marking
  • The Control Panel shall be CE marked in accordance with relevant EU directives.

The challenges and our solutions:
 We identified a number of non-compliances against Engineering Standard ES_1_2322_1 Issue 2 and ES_1_7273_1 Issue 2. We raised these and our solutions to ensure that the end control panel was compliant.

The parts we were most pleased with:
 The documents produced by our CE&I department were completed and accepted by both our client and the end client prior to the FAT testing. This included: -
  • Works test documents (internal document)
  • Dead Works FAT Test documents
  • Live Works FAT Test documents
  • Functional test documents
  • CE Marking 

​The FAT Testing was carried out at our facility in Cleator Moor with both NSG environmental and the end client in attendance. The tests included a 100% dead test and 100% live of each panel, as well as a functional test. We were able to demonstrate a full end to end test proving the functionality met the site requirements and enabled instrumentation parameters to be set-up.

This is the background of the Bottom Area shown below. It'll display correctly on published site.
If you don't want background for the bottom area, simply hover over the bottom of this image to delete it. The background of the bottom area will be a solid dark color.

Contact Us

​Delkia Limited
Unit 2G
Bridge End Ind. Estate
Egremont

Cumbria
CA22 2RD

Email: info@delkia.co.uk

​Tel: +44 (0) 1946 812288

Registered in England and Wales: 07339803
 

About Us

Delkia is a specialist Systems Integrator (SI) operating throughout the UK for highly regulated sectors including nuclear, defence, petrochemical, oil and gas.

Our approach is to build long-lasting and trusting partnerships with our clients.  This enables us to know their exact  needs, add value and innovation, as well as provide the right services, at the right time. 





Our History 

Delkia was formed in 2013 through supporting the nuclear decommissioning sector in West Cumbria.  Since this time Delkia had provided engineering services to blue-chip organisations, including local and national nuclear and defence companies as well as offshore organisations through its Digital Engineering, Specialist Systems Consultancy, Systems Integration, Control Panel Manufacturing and Software Development. 

Using expert control systems engineers we have been able to support, both tactically and strategically, to our nuclear, defence, petrochemical, oil and gas clients.  Leading to an award-winning innovative engineering automation and technology company.  
© Copyright Delkia 2021